Client:
Anglo American Metallurgical CoalLocation:
Queensland, AustraliaDuration:
3 YearsScope of Work:
At Grosvenor Mine, Redpath Australia excavated both the conveyor and transport drifts utilizing an earth pressure balance tunnel boring machine (TBM).
Grosvenor Mine is located 5 km north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional longwall methods.
This was the first use of a TBM approved for drift construction, in an underground coal mine in Queensland.
967 m EXCAVATED BY EPBM METHOD |
FIRST USE OF A TBM IN UNDERGROUND COAL |
1, 258 m EXCAVATED BY EPBM METHOD |