Client:

Anglo American Metallurgical Coal

Location:

Queensland, Australia

Duration:

3 Years

Scope of Work:

Mechanical Excavation

At Grosvenor Mine, Redpath Australia excavated both the conveyor and transport drifts utilizing an earth pressure balance tunnel boring machine (TBM).

Grosvenor Mine is located 5 km north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional longwall methods.

This was the first use of a TBM approved for drift construction, in an underground coal mine in Queensland.

967 m

EXCAVATED BY EPBM METHOD
1:6 gradient conveyor drift

FIRST USE OF A TBM

IN UNDERGROUND COAL
MINES IN QUEENSLAND

1, 258 m

EXCAVATED BY EPBM METHOD
1:8 gradient transport drift

 