Cliente:

Anglo American Metallurgical Coal

Lugar:

Queensland, Australia

Duración:

3 Years

Alcance del trabajo:

Excavación Mecánica

The Grosvenor Mine is located 5 km north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional longwall methods.

At Grosvenor Mine, Redpath Australia excavated both the conveyor and transport drifts utilizing an earth pressure balance tunnel boring machine (TBM).

This was the first use of a TBM approved for drift construction, in an underground coal mine in Queensland.

967 m

EXCAVATED BY EPBM METHOD
1:6 gradient conveyor drift

FIRST USE OF A TBM

IN UNDERGROUND COAL
MINES IN QUEENSLAND

1, 258 m

EXCAVATED BY EPBM METHOD
1:8 gradient transport drift

 