Client:
Anglo American Metallurgical CoalLocation:
Queensland, AustraliaDuration:
3 YearsScope of Work:
At Grosvenor Mine, Redpath Australia excavated both the conveyor and transport drifts utilizing an earth pressure balance tunnel boring machine (TBM).
Grosvenor Mine is located 5 km north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional longwall methods.
This was the first use of a TBM approved for drift construction, in an underground coal mine in Queensland.
|
967m Excavated By EPBM Method1:6 Gradient Conveyor Drift |
First Use Of A TBMIn Underground Coal Mines In Queensland |
1,258m Excavated By EPBM Method1:8 Gradient Transport Drift |