Regresar

Cliente:

PT Freeport Indonesia

Lugar:

Papua, Indonesia

Duración:

40+ Years

Alcance del trabajo:

Desarrollo minero
Producción minera bajo contrato
Construcción subterránea
Raiseboring
Excavación en ascenso mecanizada

PT Freeport Indonesia (PTFI) remains Redpath’s longest continuing client relationship.

Redpath has provided a full range of services, contributing to the development and production of the world’s largest block cave operation – the Grasberg Block Cave (GBC) – where over 100,000 tonnes are extracted per day.

The Redpath team also participated in setting a record in lateral development of 400,000 metres in the last ten years at the GBC and Deep Mill Level Zone (DMLZ) Mines.

Redpath’s services to this project include mass excavation, raiseboring, mechanized raise development, technical services, underground production and construction.

100,000+

TONNES EXTRACTED
on a daily basis from PTFI's GBC Mine

30,000+

METRES DEVELOPED ANNUALLY
at the PTFI project

8,000 m

ONGOING CLIENT RELATIONSHIP
with PTFI

 

Regresar