Cliente:
Sumitomo Metal Mining Co. Ltd.Lugar:
Alaska, Estados UnidosDuración:
14 añosAlcance del trabajo:
Desarrollo minero
Producción minera bajo contrato
Construcción subterránea
Raiseboring
Excavación en ascenso mecanizada
The Pogo Mine project represented a multidisciplinary, long-term client relationship that included a wide range of services performed over a 15-year span.
The project involved the following:
- Development of three portals
- 107.8 km of underground development and production
- 1.2 km of vertical development
- Underground coarse ore storage, ore access and ore bin excavation and construction
- Highwall development
- Several internal mechanized raise climber raises
- Sump development and installation
- Paste backfill piping system
- 383 m of 4.3 m diameter raiseboring
- Installation of mechanical infrastructure including mine electrical distribution systems and ore handling systems
- Installation and commissioning of underground mine air compressors
|
-40°C Subarctic Temperatures & Conditions |
107.8km Total Excavation |
383m Raisebored At 4.3m Diameter |