Regresar

Cliente:

BGE GmbH

Lugar:

Salzgitter, Germany

Duración:

16 años, en curso

Alcance del trabajo:

Construcción subterránea
Excavación masiva

Konrad Mine is an abandoned iron ore mine that is converted into a permanent disposal site for radioactive waste.

Redpath Deilmann's work with Shaft 1 involved rehabilitation, stripping, equipping and a completely new shaft installation.

The central part of the future nuclear repository is the Konrad 2 shaft, which was sunk in the 1960's. Redpath Deilmann is involved in four independent contracts at this site.

The Konrad 2 shaft will be used for hoisting of containers with radioactive waste. Conversion of the shaft and shaft-station level was completed (90 m length and final diameter 10 m), along with a new shaft installation.

Redpath Deilmann's project involvement includes shaft rehabilitation, tunneling and underground construction, design and construction of hoisting system.

Project Image - Konrad Mine - Expertise Converting Mines Into Nuclear Storage Facilities

Expertise In Converting Mines
Into Nuclear Storage Facilities

Project Image - Konrad Mine - 13m Diameter

13m Diameter

Project Image - Konrad Mine - 4,200 Tonnes Shotcrete Placed

4,200 Tonnes Shotcrete Placed