Excavación Mecánica

The Grosvenor Mine is located 5 km north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional longwall methods.

At Grosvenor Mine, Redpath Australia excavated both the conveyor and transport drifts utilizing an earth pressure balance tunnel boring machine (TBM).

This was the first use of a TBM approved for drift construction, in an underground coal mine in Queensland.

Project Image - Grosvenor Mine - 967m Excavated By EPBM Method

967m Excavated By EPBM Method

1:6 Gradient Conveyor Drift

Project Image - Grosvenor Mine - First Use Of A TBM In Underground Coal Mines

First Use Of A TBM

In Underground Coal Mines In Queensland

Project Image - Grosvenor Mine - 1258m Excavated by EPBM Method

1,258m Excavated By EPBM Method

1:8 Gradient Transport Drift